Print Image


Appliances and piping are reinstalled


Photo by Brian Wise. The #2 was moved back inside the MRSR shop for final assembly. The shop was a frenzy of activity as volunteers and staff worked long and hard to install the final pieces that would make the Willamette operational in time for its first scheduled run on August 1st.