Print Image


Last concrete pour for foundation


29 September was a mixed day of sun and rain, and it was the last concrete pour for the Train Shed foundation. The outline of the building is now clearly visible as is the beauty of the site. Behind the photographer, CalPortland trucks were cued up behind a massive 40-meter class Putzmiester concrete pumper that lifted the mix and deposited it in the forms.