Print Image


Machinery to construct piles arrives


This equipment arrived on August 5 and will be used to construct the piling system. The Train Shed structure includes an AugerCast piling system to support the building. 76 piles each approximately 25 feet deep will support the building and stabilize it, especially during a seismic event.