New pile caps for bridge 35


In the fall of 2003, rehabilitation of bridge 35 began. The intermediate phase included renewal of 3 of 4 pile caps under either end of the steel span. So the entire structure - about 750,000 lbs - was lifted so the new wood beams could be inserted.